BSA™ Increased Production Uptime
The Residual Inhibitor Concentration (RSI) in the produced water phase of an offshore producing oil well in Norway, was closely approaching the critical Minimum Inhibitor Concentration (MIC).
Due to a one-month lead time for mobilizing scale inhibitor for the squeeze operation, the operator was in risk of having to shut the well in.
Read more in our Field Case (pdf).